User 1019
Well-Known Member
- Joined
- Jul 25, 2004
- Messages
- 17,679
It may take a few minutes of explaining to get to the question, but I need some board input.
My wife and I are going to upgrade our master bath (doing the lion's share of the work ourselves). And, just to be clear, we're not trying to make a bunch of money with these upgrades. We're just trying to make the place stand out a little and, thus, easier to sell.
Our bathroom is fairly standard for this area, I think. Double sink and counter, large tub and a separate small shower stall. The off-the-shelf shower stall is about 36 inches deep by 32 inches wide. There is room for expansion on one side of the shower, where what I think is a "false wall" is built, so that it fits the off-the-shelf shower stall. Basically, they stuck a cheap, tiny shower stall in from Home Depot and filled in the rest of the space with a wall.
The way we see it, we have three options, all increasing in price, difficulty and possible payoff.
1.) Our first option is to tile the existing structure, with no expansion. Rip out the shower stall, tile the shower and floor.
2.) Option two is to rip out the shower stall, knock out the "false wall" and tile an expanded shower and floor. This would give us another 16 inches, or so, of width in the shower and would definitely spruce up the place.
3.) Option three would be the most expensive and hardest, but could have the most payoff. We could rip out the existing bathtub and shower stall. Build a custom shower where the tub currently sits and turn the current shower stall into a proper linen closet. This would completely remove the tub from the master bath. It would obviously be a pretty large shower space that could possibly be turned into something special. It would free up some space in the bathroom by moving things into a linen closet that we don't currently have. There would still be a tub in the house, in a guest bathroom, which is right beside our bedroom.
Now, SJ, my question to you is: Which would you do? We're really struggling with this decision and need some input.
My wife and I are going to upgrade our master bath (doing the lion's share of the work ourselves). And, just to be clear, we're not trying to make a bunch of money with these upgrades. We're just trying to make the place stand out a little and, thus, easier to sell.
Our bathroom is fairly standard for this area, I think. Double sink and counter, large tub and a separate small shower stall. The off-the-shelf shower stall is about 36 inches deep by 32 inches wide. There is room for expansion on one side of the shower, where what I think is a "false wall" is built, so that it fits the off-the-shelf shower stall. Basically, they stuck a cheap, tiny shower stall in from Home Depot and filled in the rest of the space with a wall.
The way we see it, we have three options, all increasing in price, difficulty and possible payoff.
1.) Our first option is to tile the existing structure, with no expansion. Rip out the shower stall, tile the shower and floor.
2.) Option two is to rip out the shower stall, knock out the "false wall" and tile an expanded shower and floor. This would give us another 16 inches, or so, of width in the shower and would definitely spruce up the place.
3.) Option three would be the most expensive and hardest, but could have the most payoff. We could rip out the existing bathtub and shower stall. Build a custom shower where the tub currently sits and turn the current shower stall into a proper linen closet. This would completely remove the tub from the master bath. It would obviously be a pretty large shower space that could possibly be turned into something special. It would free up some space in the bathroom by moving things into a linen closet that we don't currently have. There would still be a tub in the house, in a guest bathroom, which is right beside our bedroom.
Now, SJ, my question to you is: Which would you do? We're really struggling with this decision and need some input.